View Notification
No notifications.

Sewer

The City of Tuscaloosa has over 700 plus miles of sewer collection lines with 66 active lift stations and over 12,000 manholes. The Water & Sewer Department also operates the Hilliard N. Fletcher Water Resource Recovery Facility, which treats over 17 million gallons of wastewater each day. The Water & Sewer Department provides uninterrupted clean water and sewer services to Tuscaloosa residents.

Additionally, the collections network of the Water & Sewer Department has a robust maintenance plan which includes acoustic pipe inspection, closed-circuit TV pipe inspection, gravity line maintenance cleaning, gravity line replacement, system point repairs, manhole inspection, manhole rehabilitation, system smoke testing, and a formal Fats, Oils & Grease (FOG) program.

Finally, an achievement that the department is especially proud of is reducing the number of sanitary sewer overflows (SSOs) per year to a fraction of what it was in previous years. SSOs have been reduced by over 80% since 2009. This improvement is primarily due to the increased frequency of sewer manhole and line inspection, cleaning, and rehabilitation, combined with the formalized FOG program.

 
 

Sanitary Sewer Overflow Notice

Date: 5/10/2024

Discharge:  55,000 gallons approximately

Location: 6400 block of Garner Rd

Latitude: 33.144058

Longitude: -87.488930

Destination: UT to Rum Creek to Cypress Creek

Cause:  Broken line

Failure: The City's Operations Technical Services group assessed an SSO upstream of plugged manholes necessary for sewer line repairs to be performed. SSO signage is in place and the affected areas were cleaned & disinfected.  The Tuscaloosa County Health Department and the Alabama Department of Environmental Management have been notified.

                                                            

Sanitary Sewer Overflow Notice

Date: 5/10/2024

Discharge:  500 gallons approximately

Location: 5th Ave E. & 23rd St E.

Latitude: 33.190038

Longitude: -87.530177

Destination: UT to Cribbs Mill Creek

Cause:  Debris

Failure: The City's Operations Technical Services group assessed an SSO at the intersection of 5th Ave E and 23rd St E. Jet/vac trucks were utilized to remove blockage which ended the discharge. SSO signage is in place and the affected areas were cleaned & disinfected. CCTV follow up investigation is scheduled for Monday 5-13-24. The Tuscaloosa County Health Department and the Alabama Department of Environmental Management have been notified.

                                                            

Sanitary Sewer Overflow Notice

Date: 5/9/2024

Discharge:  2,000 gallons approximately

Location: Garner Rd

Latitude: 33.144115

Longitude: -87.489111

Destination: UT to Rum Creek

Cause:  Broken Sewer Line

Failure: The City's Operations Technical Services group assessed an SSO on a City ROW off of Garner Rd. The SSO was attributed to a broken sewer line. City contractors mobilized bypass pumps on site which ended the discharge. Repairs are scheduled for 5-10-24. Affected areas were cleaned & disinfected. SSO signage was placed. The Tuscaloosa County Health Department and the Alabama Department of Environmental Management have been notified.

                                                            

Sanitary Sewer Overflow Notice

Date: 5/8/2024

Discharge:  5,250 gallons approximately

Location: Lift Station #40 @ 15911 Progress Drive

Latitude: 33.188086

Longitude: -87.314461

Destination: Little Hurricane Creek

Cause:  Lift Station Equipment Failure

Failure: The City's Operations Technical Services group assessed an SSO at the City's Pump Station #40. Techs determined that the cause of the overflow was due to pump air lock. Repairs were performed and the SSO has ended. Affected areas were cleaned & disinfected. SSO signage was placed. The Tuscaloosa County Health Department and the Alabama Department of Environmental Management have been notified.

                                                            

Sanitary Sewer Overflow Notice

Date: 4/18/2024

Discharge:  1000 gal. approx. 

Location: 100 Block of 15th St.

Latitude: 33.199806

Longitude: -87.535953

Destination: UT to Cribbs Mill Creek

Cause:  Failed/Damaged/Collapsed Sewer Line

Failure: The City's Operations Technical Services group assessed a broken sewer line in the 100 Block of 15th St.. City contractors were dispatched to make repairs to the broken sewer line. Affected area was cleaned & disinfected. SSO signage was placed. The Tuscaloosa County Health Department and the Alabama Department of Environmental Management have been notified.